We are off to a good start after the holidays.

In September, we face two incredible challenges: An installation of almost 8,000 heat cost allocators, in which we guarantee the collection of 100% of these meters in less than 24 hours. Introducing our measurement system in the renovation of an emblematic building, in which more than 8 million euros have been invested. We take care of monitoring heating/AC, water, and electricity consumption of its luminaires.

And all in Zaragoza, a city in which we are establishing ourselves very strongly!